WHAT YOU GET:
Complete company energy analysis with photovoltaic installation scheme and energy storage preliminary project
Complete company energy analysis with photovoltaic installation scheme and energy storage preliminary project
STAGE I: ENERGY AUDIT AND ANALYSIS (4-6 weeks)
Price: 18,500 PLN net
DETAILED SCOPE:
ENERGY CONSUMPTION ANALYSIS:
- Detailed analysis of 15-minute meter readings for min. 12 months period
- Identification of power consumption peaks and optimization opportunities
- Analysis of energy costs in different tariffs and time zones
- Detection of anomalies and energy waste
- Benchmarking with similar companies in the industry
ENERGY POTENTIAL AUDIT:
- Assessment of building and site energy potential
- Analysis of lighting modernization opportunities (LED, control systems)
- Review of HVAC systems for energy optimization
- Identification of high energy consumption equipment
- Thermal imaging of buildings (thermal bridge identification)
OPTIMIZATION RECOMMENDATIONS:
- Catalog of zero-cost actions (habit changes, setting optimization)
- Low-cost investment proposals (ROI < 2 years)
- Medium-term action plan (ROI 2-5 years)
- Estimated potential savings for each action
- Action prioritization by economic efficiency
STAGE II: PV+BESS INSTALLATION PROJECT (6-8 weeks)
Price: 26,500 PLN net
DETAILED SCOPE:
PRELIMINARY PHOTOVOLTAIC INSTALLATION PROJECT:
- Solar irradiation analysis and mounting possibilities
- Optimal PV installation power selection (considering consumption profile)
- Preliminary panel layout project with shadow simulation
- Selection and specification of panel and inverter technologies (comparison of different variants)
- Energy production calculation considering local conditions
ENERGY STORAGE SYSTEM (BESS):
- Optimal energy storage capacity selection
- Analysis of different battery technologies (Li-ion, LFP, NMC)
- Energy management system specification
- Battery charging/discharging strategies
- Preliminary integration plan with PV installation and company infrastructure
ECONOMIC ANALYSIS:
- Detailed investment cost calculation
- Analysis of available subsidies and tax reliefs
- NPV, IRR and investment payback period calculation
- 10 or 25-year financial flow simulation
- Scenario analysis at different energy prices
PRELIMINARY DOCUMENTATION:
- Preliminary conceptual projects of PV and BESS installations
- Detailed technical specifications of all components
- Preliminary schedule for project development stage
- Construction implementation schedule
- Preliminary commissioning and startup procedures highlight
EXTENDED OPTION – PROJECT DEVELOPMENT:
Available as separate service (individual pricing depending on scope)
-
STAGE 1: BUILDING CONDITIONSObtaining Building Conditions for installation. Alternatively: support in Local Development Plan changes. Preparation of urban planning documentation. Cooperation with offices and architects.8,000-15,000 PLN net
-
STAGE 2: ENVIRONMENTAL DECISIONRequired for PV installations above 2ha area. Required for BESS storage above 1ha area. Environmental impact report. Consultation procedures and decision obtaining.individual pricing
-
STAGE 3: CONNECTION CONDITIONSPreparation and submission of Connection Conditions application. Technical analysis of connection possibilities. Negotiations with Distribution System Operator. Obtaining final Connection Conditions.12,000-25,000 PLN net
-
STAGE 4: BUILDING PROJECT AND PERMITSPreparation of complete Building Project. Executive projects of PV and BESS installations. Detailed EMS (Energy Management System) projects. Obtaining Building Permit. Complete technical documentation for implementation.15,000-35,000 PLN net
FULL DEVELOPMENT PACKAGE
All above stages in one package. Coordination of entire development process. Author supervision over procedures. Support in tender processes with contractors.
35,000-60,000 PLN net
EXPECTED RESULTS:
- Energy consumption optimization: 15-25% through identified improvements
- PV savings potential: 60-80% coverage of electricity consumption
- Self-consumption optimization: 70-85% thanks to well-selected storage
- Estimated payback period: 6-9 years for complete PV+BESS installation
- Expert support: Continuous access to energy advisory team
- Development preparation: Complete preliminary documentation ready for implementation
BILLING AND PAYMENTS:
Total value
45,000 PLN net
- Upon contract signing
40% (18,000 PLN net) - After Stage I completion
35% (15,750 PLN net) - After complete documentation delivery
25% (11,250 PLN net)
GUARANTEES AND ADDITIONAL SERVICES:
- Accuracy guarantee: Deviation of actual savings from forecasts max. 10%
- Continuous expert access: Direct contact with energy advisory team
- Development support: Close cooperation with contractors (additional option: 12,000 PLN net)
- Planning monitoring: Support in schedule optimization for 12 months
- Analysis update: One Free calculation update within a year