COMPREHENSIVE ENERGY ANALYSIS AND PV+BESS PROJECT

Energy Consumption Optimization

Two-stage implementation with ROI calculation

WHAT YOU GET:
Complete company energy analysis with photovoltaic installation scheme and energy storage preliminary project

STAGE I: ENERGY AUDIT AND ANALYSIS (4-6 weeks)

Price: 18,500 PLN net

DETAILED SCOPE:

ENERGY CONSUMPTION ANALYSIS:

  • Detailed analysis of 15-minute meter readings for min. 12 months period
  • Identification of power consumption peaks and optimization opportunities
  • Analysis of energy costs in different tariffs and time zones
  • Detection of anomalies and energy waste
  • Benchmarking with similar companies in the industry

ENERGY POTENTIAL AUDIT:

  • Assessment of building and site energy potential
  • Analysis of lighting modernization opportunities (LED, control systems)
  • Review of HVAC systems for energy optimization
  • Identification of high energy consumption equipment
  • Thermal imaging of buildings (thermal bridge identification)

OPTIMIZATION RECOMMENDATIONS:

  • Catalog of zero-cost actions (habit changes, setting optimization)
  • Low-cost investment proposals (ROI < 2 years)
  • Medium-term action plan (ROI 2-5 years)
  • Estimated potential savings for each action
  • Action prioritization by economic efficiency

STAGE II: PV+BESS INSTALLATION PROJECT (6-8 weeks)

Price: 26,500 PLN net

DETAILED SCOPE:

PRELIMINARY PHOTOVOLTAIC INSTALLATION PROJECT:

  • Solar irradiation analysis and mounting possibilities
  • Optimal PV installation power selection (considering consumption profile)
  • Preliminary panel layout project with shadow simulation
  • Selection and specification of panel and inverter technologies (comparison of different variants)
  • Energy production calculation considering local conditions

ENERGY STORAGE SYSTEM (BESS):

  • Optimal energy storage capacity selection
  • Analysis of different battery technologies (Li-ion, LFP, NMC)
  • Energy management system specification
  • Battery charging/discharging strategies
  • Preliminary integration plan with PV installation and company infrastructure

ECONOMIC ANALYSIS:

  • Detailed investment cost calculation
  • Analysis of available subsidies and tax reliefs
  • NPV, IRR and investment payback period calculation
  • 10 or 25-year financial flow simulation
  • Scenario analysis at different energy prices

PRELIMINARY DOCUMENTATION:

  • Preliminary conceptual projects of PV and BESS installations
  • Detailed technical specifications of all components
  • Preliminary schedule for project development stage
  • Construction implementation schedule
  • Preliminary commissioning and startup procedures highlight

EXTENDED OPTION – PROJECT DEVELOPMENT:

Available as separate service (individual pricing depending on scope)

  • STAGE 1: BUILDING CONDITIONSObtaining Building Conditions for installation. Alternatively: support in Local Development Plan changes. Preparation of urban planning documentation. Cooperation with offices and architects.

    8,000-15,000 PLN net
  • STAGE 2: ENVIRONMENTAL DECISIONRequired for PV installations above 2ha area. Required for BESS storage above 1ha area. Environmental impact report. Consultation procedures and decision obtaining.

    individual pricing
  • STAGE 3: CONNECTION CONDITIONSPreparation and submission of Connection Conditions application. Technical analysis of connection possibilities. Negotiations with Distribution System Operator. Obtaining final Connection Conditions.

    12,000-25,000 PLN net
  • STAGE 4: BUILDING PROJECT AND PERMITSPreparation of complete Building Project. Executive projects of PV and BESS installations. Detailed EMS (Energy Management System) projects. Obtaining Building Permit. Complete technical documentation for implementation.

    15,000-35,000 PLN net
FULL DEVELOPMENT PACKAGE

All above stages in one package. Coordination of entire development process. Author supervision over procedures. Support in tender processes with contractors.

35,000-60,000 PLN net

EXPECTED RESULTS:

  • Energy consumption optimization: 15-25% through identified improvements
  • PV savings potential: 60-80% coverage of electricity consumption
  • Self-consumption optimization: 70-85% thanks to well-selected storage
  • Estimated payback period: 6-9 years for complete PV+BESS installation
  • Expert support: Continuous access to energy advisory team
  • Development preparation: Complete preliminary documentation ready for implementation

BILLING AND PAYMENTS:

Total value
45,000 PLN net
  • Upon contract signing
    40% (18,000 PLN net)
  • After Stage I completion
    35% (15,750 PLN net)
  • After complete documentation delivery
    25% (11,250 PLN net)

GUARANTEES AND ADDITIONAL SERVICES:

  • Accuracy guarantee: Deviation of actual savings from forecasts max. 10%
  • Continuous expert access: Direct contact with energy advisory team
  • Development support: Close cooperation with contractors (additional option: 12,000 PLN net)
  • Planning monitoring: Support in schedule optimization for 12 months
  • Analysis update: One Free calculation update within a year